Job #384: NASA Mobile Data Aquisition & Control Trailer

384-1

NASA's Mobile Data Acquisition and Control Traileris used by their Marshall Space Flight Center to gather test data on flight propulsion systems.

Highlights Include:

  • 45’ gooseneck, 3-torsion axles; sub-divided into an operations room and IT/data collection equipment room
  • Custom rear door configuration (Ramp and swing-out) for ease of equipment loading
  • Custom cable feed-through openings with weather-proof doors and brush linings for vector control
  • Rubber coin flooring
  • Insulated walls and ceiling
  • All aluminum, seamless interior (operations area)
  • 3-phase Power Distribution Panel custom configured to meet NASA specifications with Russell-Stoll shore-power receptacle
  • Imbedded electrical wiring, VGA (monitors) cabling, CAT 6 cabling
  • Clegg-custom cable patch-panel bulkheads
  • 6” All aluminum, painted, cable trays spanning the length/width of the trailer for additional equipment cables and wiring--future expansion of mission requirements
  • Samsung High-Efficiency, Low-noise HVAC (mini-split) with compressor in the gooseneck (with Clegg-custom plenum chamber) and individually controlled evaporators in the operations and server rooms
  • Clegg-custom moldings
  • Clegg-custom work-station surfaces for operators and Lead Test Engineer
  • Clegg-custom printer work-station and cabinet
  • 32” Sony Bravia monitors at operator work stations; installed with Codytech fully-articulated, stackable mounting brackets
  • Custom-installed monitor travel brackets and tie-downs
  • 42” Sony Bravia monitors static-mounted at bunk-wall for results reporting
  • Custom-installed 19” x 72” computer racks
  • Custom-installed E-track